Dongyang Street Parking: AKE’s 200-Space Pilot

AKE’s historical Dongyang street-parking report describes a first-phase pilot covering 200 roadside spaces on Wuning Dong Road and Piaoping Road in Zhejiang. The recorded approach combined magnetic detection, handheld collection equipment and street-parking software.

Image retained with the original Dongyang project record
Image retained with the original Dongyang project record.

A roadside parking management pilot

The project was intended to organise the use of roadside parking spaces and the collection of parking fees. The original article describes trial operation, so the pilot should be read in that historical context rather than as a statement about the city’s current parking network.

Connect occupancy information with the operating process

The archived design linked detection at each space with the software and handheld equipment used in the collection process. Its communication details belong to the system described at the time and should not be treated as a specification for a new deployment.

A current roadside project needs its own review of network coverage, power arrangements and operating responsibilities.

Questions for a new street-parking brief

Define the parking area, the rules that apply at the location and the intended collection workflow before choosing equipment. Agree how field staff will handle discrepancies and how the operator will reconcile parking and transaction records. The applicable tariff and local operating rules must come from the responsible authority.

Questions and answers

How many spaces were included in the recorded pilot?

The first phase described in the archive covered 200 roadside spaces on Wuning Dong Road and Piaoping Road.

Can the old communications specification be reused as a current design?

It should be treated as historical context. A new design needs confirmation of current equipment, connectivity and operational requirements.

Get a Custom Quote