District 8 Jakarta: Repeat Parking-Guidance Orders and Future Upgrades

Indonesia · Parking guidance

AKE’s District 8 Jakarta records show successive parking-guidance orders covering 2,916 spaces cumulatively from 2018 to 2022. The project album provides exterior photographs of the development; the equipment description comes from the corresponding supply record.

District 8 exterior photograph from AKE’s project album; this is a building view, not an installation photograph.
District 8 exterior photograph from AKE’s project album; this is a building view, not an installation photograph.

Maintaining one guidance approach as a project grows

Successive orders create a practical integration requirement: each additional zone should fit the existing bay identifiers, controller network and driver-facing signs. The documented ultrasonic detectors and indicators support bay occupancy guidance. For an expanding development, consistent zone names and an agreed controller map help keep each addition understandable to drivers and operators.

Jakarta skyline photograph retained in the District 8 project album.
Jakarta skyline photograph retained in the District 8 project album.

Project scale and order history

Cumulative coverage across recorded orders; not a count of unique physical bays currently on site.
Order yearRecorded areaSpaces in that year’s ordersCumulative spaces
2018Parking guidance1,0001,000
2019Parking guidance5001,500
2021Parking guidance350 + 8 + 3502,208
2022Parking guidance7082,916

The first recorded order covers 1,000 spaces in 2018, followed by 500 in 2019. Three 2021 records add 350, eight and 350 spaces; the 2022 record adds 708. These repeat orders show continued customer adoption of AKE. The available June 2021 shipment contains 350 detectors, 350 indicators, three controllers and four LED modules; it is one shipment, not the equipment total for all five years.

Products supplied

Available supply schedules. Quantities are supplied items; they are not used to calculate parking spaces.
Shipment datesOrder stageEquipment recorded
2021-06-30Recorded supply4 led display modules; 350 ultrasonic detectors; 3 ultrasonic controllers; 350 parking-space indicator lights

Where the project can go next

The following are proposed upgrades, separate from the recorded installation.

Before a further order, reconcile the earlier installation zones with the latest floor plans. Audit controller capacity and communication paths, then commission each new zone against both its local signs and the shared guidance view. Keep a clear device and spare-parts list by order stage.

Indoor and underground parking

For indoor parking serving different destinations, place pay stations and car-finder kiosks at the appropriate pedestrian lobbies. Add video guidance only where plate-based finding is required and a verified plate-to-space association can be maintained.

Gated outdoor parking

Use STAR PMS, card terminals and barriers at suitable controlled entrances. Define the access rules for each user group, how a card authorises gate release, and how drivers call the operator when assistance is needed.

Open outdoor parking

If future phases include open outdoor parking, evaluate video bollards, geomagnetic sensors and curbside devices against the actual layout. Keep outdoor occupancy and payment events consistent with the main parking system.

The photographs are exterior project views. They are not evidence of installed equipment. The 2,916 figure is cumulative order coverage, not a claim about the development’s current unique parking capacity.